Infinity Supercritical LLC


Publication Title | MARIJUANA GROWING AND OIL EXTRACTION PROCESSES SEATTLE FIRE DEPARTMENT

Cannabis Search Engine Series

Cannabis | CO2 Extraction | Oil Extraction | Supercritical CO2 Fluid Extraction search was updated real-time via Filemaker on:

Cannabis | CO2 Extraction | Oil Extraction | Supercritical CO2 Fluid Extraction | Return to Search List

Search Completed | Title | MARIJUANA GROWING AND OIL EXTRACTION PROCESSES SEATTLE FIRE DEPARTMENT
Original File Name Searched: AdRule53.01.15.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | MARIJUANA GROWING AND OIL EXTRACTION PROCESSES SEATTLE FIRE DEPARTMENT | 001



Administrative Rule 53.01.15

SEATTLE FIRE DEPARTMENT

SUBJECT:

MARIJUANA GROWING AND OIL EXTRACTION PROCESSES

EFFECTIVE DATE: February 12, 2015

REFERENCES:

Seattle Fire Code Chs. 50, 53, 57 & 61 Washington Administrative Code 314-55-104 NFPA 497

NFPA 30

SUPERSEDES: NONE – NEW RULE

FCAB REVIEW DATE: January 20, 2015

NOTICE: Administrative Rules are established per Seattle Fire Code Section 104.1, and they are subject to the Administrative Sections 104.9 Alternate Materials and Methods, Section 104.8 Modifications, and Section 108.1 Appeals.

APPROVED:

__________________________________________ JOHN NELSEN, FIRE MARSHAL

Section 1. SCOPE

The growing and processing of marijuana can involve several hazardous processes such as carbon dioxide gas enrichment, liquefied petroleum gas extraction, alcohol extraction etc. These hazardous processes are regulated by the Seattle Fire, Building, Mechanical, Plumbing and Electrical codes and Washington State Administrative Code 314-55-104. Washington State Administrative Code 314-55-104 can be found at the following link: http://apps.leg.wa.gov/WAC/default.aspx?cite=314-55-104

This rule provides specific requirements for each of these processes for controlling the fire, explosion and asphyxiation hazards associated with marijuana growing and processing operations. This rule does not provide a list of all possible fire code requirements applicable to every possible hazard, only the most common requirements applicable this particular occupancy have been provided in this rule.

Section 2. PERMITS

The following permits may be required depending on the extent of building construction and specific operations being conducted in each facility:

Building Permits: A building permit issued by the Seattle Department of Planning and Development (DPD) is required for any modifications made to the building, except for work listed in Section 106.2 of the Seattle Building Code which can be read at the following link:

Seattle Fire Department 220 3 Avenue South Seattle, WA 98104

For Information Call (206) 386-1450 www.seattle.gov/fire

Administrative Rule 53.01.15 Effective February 10, 2015

Page 1 of 6

Image | MARIJUANA GROWING AND OIL EXTRACTION PROCESSES SEATTLE FIRE DEPARTMENT



marijuana-growing-and-oil-extraction-processes-seattle-fire-department
Supercritical CO2 Fluid Extractor | Oil Extract Using Infinity Supercritical CO2 Extraction System - Botanical CO2 Extraction System - Go to website

Search Engine Contact: greg@infinitysupercritical.com